Bhilai Captive Power Plant
NTPC Ltd formed a joint venture with SAIL on 50:50� basis with SAIL in March, 2001 in the name NTPC-SAIL Power Company (P) Ltd (NSPCL). NTPC Ltd formed another joint venture company with SAIL on 50:50 basis in March, 2002 in the name of Bhilai Electric Supply Company (P) Ltd. (BESCL). BESCL took over captive power plant-II located at Bhilai Steel Plant (2X30 MW + 1X14 MW BPTG) from SAIL. �With effect from 11th September, 2006, BESCL was amalgamated with NSPCL and all properties, licenses, permissions, debt, liabilities
etc. with respect to BESCL now rests in NSPCL.
Objective:
To supply power to Bhilai, Steel Plant of Steel Authority of India Ltd. (SAIL) from its coal based captive power plant –II at Bhilai (Chhattisgarh) 2X30 MW + 1X14 MW.
The station is ISO 9001 : 2000 certified.
Rourkela Captive Power Plant
NTPC Ltd formed a joint venture with SAIL on 50:50 �basis with SAIL in March, 2001 in the name NTPC-SAIL Power Company (P) Ltd (NSPCL). NSPCL took over captive power plant-II located at Rourkela Steel Plant (2X60 MW) from SAIL.
Objective:
To supply power to Rourkela Steel Plant of Steel Authority of India Ltd. (SAIL) from its coal based captive power plants –II Rourkela (Orissa) 2X60 MW.
The station is ISO 9001 : 2000 certified.
Durgapur Captive Power Plant
NTPC Ltd formed a joint venture with SAIL on 50:50 �basis with SAIL in March, 2001 in the name NTPC-SAIL Power Company (P) Ltd (NSPCL). NSPCL took over captive power plant-II located at Durgapur Steel Plant (2X60 MW) from SAIL.
Objective:
To supply power to Durgapur Steel Plant of Steel Authority of India Ltd. (SAIL) from its coal based captive power plants –II at Durgapur (West Bengal).
The station is ISO 9001 : 2000 certified.
Bhilai 2X250 MW Captive Expansion Power Project
To meet the power requirement of Bhilai Steel Plant and other units of SAIL, NSPCL is implementing an expansion project at Bhilai. This consists of 2 units of 250 MW. The units are expected to be commissioned in 2008-09. After meeting captive power requirement of BSP and other units of SAIL balance power would be supplied to the beneficiaries in the Western Grid. |